Application guide
Resin for Composite Tooling and Mould Production
How FRP moulds are built off a pattern, and the isophthalic NPG-based tooling grade the catalogue lists for composite mould production.
A moderately thixotropic grade listed for mould making.
What manufacturers build
Why this material suits the work
Required resin characteristics
- Moderate thixotropy (typical index 2.5–3.8) for laminating on vertical and angled faces of a pattern
- A gel time that allows the tool laminate to be built in stages (typical 15–30 minutes at 25 °C)
- The reactive, high-molecular-weight NPG-based isophthalic chemistry the catalogue describes for mould production
- Compatibility with the tooling gelcoat and release system, confirmed by trial
- Non-accelerated supply, so the mould maker sets the cure for each stage
Process context
Advantages
- A grade the catalogue lists specifically for composite mould production and tooling
- Moderately thixotropic, with a published thixotropic index of 2.5–3.8
- Isophthalic NPG-based chemistry the catalogue describes as highly reactive and high in molecular weight
- Non-accelerated supply leaves control of the cure with the mould maker
Common products
- Production moulds for FRP parts
- Moulds taken off patterns and plugs
- Moulds for hand lay-up and spray-up production
- Tooling and die preparation
Common questions
No. It is an isophthalic NPG-based resin retained in the SPR 401 code range. The code does not make it terephthalic.
No mould-life figure is published. It depends on how the mould is built, the gelcoat and release system, the parts made on it and how it is maintained.
No specific pairing is published. A gelcoat is a separate product applied to the pattern before lay-up; choose it for how the mould will be used and confirm it with SPR 401 TL by trial.
Decide by what the mould has to do. SPR 401 TL is the grade the catalogue lists for composite mould production; whether a general laminating resin will serve your mould is a question for your own trials. The comparison guide on the two sets out the decision.
Building moulds?
Tell us the moulds you build, the parts they will run and the quantity you expect to take. Nepal price, packaging and lead time are confirmed on enquiry.
Contact Samrat FRP Traders